Checklist: Preparing Your AEM 6.5 Environment for an Upgrade
A comprehensive checklist to ensure your AEM 6.5 environment is ready for upgrade, covering discovery, testing, deployment, and post-upgrade validation.
Upgrading Adobe Experience Manager is a complex undertaking that requires careful preparation. This checklist will help you ensure nothing is overlooked as you plan and execute your AEM 6.5 upgrade.
Phase 1: Discovery & Assessment
Environment Inventory
- Document all AEM instances (author, publish, dispatcher)
- List all integrations (CRM, analytics, DAM, etc.)
- Catalog third-party packages and versions
- Identify all custom OSGi bundles and components
- Map out content structure and templates
- Document current system architecture
Custom Code Audit
- Review all custom components for deprecated APIs
- Check servlets and services for compatibility
- Audit JavaScript and client libraries
- Review custom workflows and launchers
- Identify unused or redundant custom code
- Check for hardcoded paths or configurations
Performance Baseline
- Document current page load times
- Record repository size and growth rate
- Note peak traffic patterns and response times
- Benchmark query performance
- Document current resource utilization (CPU, memory, disk)
Team Preparation
- Identify key stakeholders and decision-makers
- Assign upgrade project roles and responsibilities
- Schedule regular status meetings
- Plan for knowledge transfer sessions
- Identify training needs for new features
Phase 2: Planning
Technical Planning
- Choose target AEM version (newer 6.5 LTS or AEM as a Cloud Service)
- Plan upgrade path (direct vs. phased)
- Design new architecture if making improvements
- Plan for dispatcher and CDN updates
- Determine database upgrade strategy
- Plan Java version upgrade if needed
Testing Strategy
- Define test scenarios covering all major features
- Identify critical user journeys to validate
- Plan for performance testing
- Schedule user acceptance testing (UAT)
- Prepare test data and content
- Set up test environments matching production
Risk Mitigation
- Document rollback procedures
- Plan for blue-green or canary deployment
- Identify potential breaking changes
- Create backup and restore procedures
- Plan communication strategy for stakeholders
- Prepare contingency plans for common issues
Resource Planning
- Secure budget for upgrade costs
- Allocate internal team time
- Engage external consultants if needed
- Schedule downtime windows
- Plan for post-upgrade support coverage
Phase 3: Development & Testing
Environment Setup
- Clone production to lower environments
- Set up development environment with new AEM version
- Configure staging environment for testing
- Implement monitoring and logging
- Set up automated deployment pipelines
Code Migration
- Upgrade custom components to new APIs
- Update deprecated code patterns
- Refactor problematic code identified in audit
- Update client libraries and dependencies
- Migrate configurations to new format if needed
- Update documentation for code changes
Integration Testing
- Test all third-party integrations
- Validate authentication and SSO
- Check data synchronization processes
- Test API endpoints and web services
- Verify CDN and dispatcher configuration
- Validate analytics and tag management
Content Migration
- Test content migration scripts
- Validate all content renders correctly
- Check for broken references
- Verify asset renditions
- Test taxonomy and metadata
- Validate multilingual content if applicable
Performance Testing
- Run load tests matching production traffic
- Test under peak load conditions
- Validate caching behavior
- Check query performance
- Monitor resource utilization
- Identify and fix performance bottlenecks
User Acceptance Testing
- Execute all planned test scenarios
- Validate critical business processes
- Test across different browsers and devices
- Verify accessibility standards
- Check for visual regressions
- Document any issues found
Phase 4: Deployment
Pre-Deployment
- Final backup of production environment
- Freeze content changes if possible
- Communicate maintenance window to users
- Prepare deployment runbook
- Assign on-call support team
- Set up monitoring and alerting
Deployment Steps
- Execute deployment according to runbook
- Validate each step before proceeding
- Monitor system health during deployment
- Perform smoke tests after each major step
- Document any deviations from plan
- Keep stakeholders updated on progress
Post-Deployment Validation
- Run automated health checks
- Validate critical functionality
- Check all integrations are working
- Verify content is intact
- Test user authentication
- Validate scheduled jobs and workflows
- Check system performance metrics
- Review logs for errors or warnings
Phase 5: Post-Upgrade
Monitoring
- Monitor error logs closely for 48-72 hours
- Track performance metrics vs. baseline
- Watch for user-reported issues
- Monitor system resource utilization
- Check for memory leaks or performance degradation
- Validate backup processes are working
Documentation
- Document the upgrade process and lessons learned
- Update architectural diagrams
- Record configuration changes
- Update runbooks and procedures
- Document known issues and workarounds
- Create knowledge base articles for team
Knowledge Transfer
- Train team on any new features used
- Share post-upgrade findings with stakeholders
- Conduct retrospective meeting
- Update onboarding materials for new team members
- Document any new monitoring or alerting
Optimization
- Review performance and identify improvements
- Optimize configurations based on monitoring
- Clean up unused code or content
- Implement any deferred optimizations
- Schedule regular health checks
Common Pitfalls to Avoid
Don’t Skip Testing
Testing in lower environments is not optional. Many issues only appear under certain conditions or with specific content.
Don’t Underestimate Timing
Most upgrades take longer than estimated. Build in buffer time for unexpected issues.
Don’t Forget About Dispatcher
The dispatcher configuration often needs updates. Test it thoroughly.
Don’t Ignore Deprecated Features
Just because deprecated code still works doesn’t mean it will continue to work in future versions.
Don’t Deploy Without Rollback Plan
If something goes wrong, you need a quick way back to the working state.
How Long Does Each Phase Take?
Based on a typical enterprise AEM implementation:
- Discovery & Assessment: 2-3 weeks
- Planning: 2-4 weeks
- Development & Testing: 4-8 weeks
- Deployment: 1-3 days
- Post-Upgrade Stabilization: 1-2 weeks
Total: Typically 12-18 weeks from start to finish for a well-planned upgrade.
Need Help?
Don’t want to tackle this alone? We’ve executed dozens of AEM upgrades and can help at any stage:
- Health Check: Assess your readiness and create a plan
- Execution: Handle the entire upgrade process
- Advisory: Guide your team through the upgrade
- Support: Provide post-upgrade support and optimization
Contact us to discuss your upgrade needs.
Download this checklist as a PDF to share with your team. Get the PDF (Coming soon)